Home > Projects > Barry waterfront, Phase 2
Barry waterfront, Phase 2
Client
Whitehead Chartered Surveyors
Contractor
Colin Jones (Rock Engineering) Ltd
Designer
Hydrock
Duration
8 weeks
Key Personnel
General Manager – Richard Wyn Owen
Contracts Manager – Darren Moore
Site Foreman – Jack Jones / Mick Cook
DESCRIPTION OF PROJECT:
Working on a portion of the slope, we installed rock netting and soil nails. Also, building a gabion wall with a rock catch trench alongside.
Work carried out using our 40:30 Merlo.