Dock Wall Repair Works


Caernarfon. Phase 2

Client

WJ Developments Ltd

Contractor

Colin Jones (Rock Engineering) Ltd

Designer

Mott MacDonald

Duration

2 weeks

Key Personnel

General Manager – Richard Wyn Owen

Contracts Manager – Darren Moore

Site Foreman – Jack Jones

DESCRIPTION OF PROJECT:

Continuing with repair work to the dock wall and incorporating the staircase protection measures.
Accessing the area of the dock wall using rope access techniques, phase 2 works were mainly:

  • repointing the cracks and sections of the masonry with material suitable for the marine environment, using clean, fresh water into mortar mixture.
  • Repointing and thoroughly cleaning of the masonry areas
  • anchor bolts placed into wall to fix material to structure
  • cutting back and cleaning of voids and cracks, before repairing
  • replacing displaced or missing bricks/stones

AS the area is a SAC and SSSI protected area, we were mindful of our environmental impact.