Geobrugg Catch Fence


Bont Evans, Corris

Client

Natural Resources Wales (NRW)

Contractor

Colin Jones (Rock Engineering) Ltd.

 

Client Consulting Engineers

Arup

Duration

2 years

Key personnel

Managing Director - David Jones   
Commercial Manager – Richard Wyn Owen
Contracts Manager – Darren Moore
Site Manager – Jack Jones

Description of Project

Main Contract: Design, Supply, and Installation of 900m of Geobrugg Catch Fence, involving excavation and concreting of post foundations and installing rock anchors. The catch fence was erected to allow for tree felling works to be carried out on the slopes above.

Additional Works

Rock scaling before and after tree felling works. Catch fence inspections and reports at regular intervals over a two-year period. The stabilisation of windblown trees. Rock netting and soil nailing works.

 