Home > Projects > Geobrugg Catch Fence
Geobrugg Catch Fence
Bont Evans, Corris
Client
Natural Resources Wales (NRW)
Contractor
Colin Jones (Rock Engineering) Ltd.
Client Consulting Engineers
Arup
Duration
2 years
Key personnel
Managing Director - David Jones
Commercial Manager – Richard Wyn Owen
Contracts Manager – Darren Moore
Site Manager – Jack Jones
Description of Project
Main Contract: Design, Supply, and Installation of 900m of Geobrugg Catch Fence, involving excavation and concreting of post foundations and installing rock anchors. The catch fence was erected to allow for tree felling works to be carried out on the slopes above.
Additional Works
Rock scaling before and after tree felling works. Catch fence inspections and reports at regular intervals over a two-year period. The stabilisation of windblown trees. Rock netting and soil nailing works.