Client

Llechwedd / Greaves Welsh Slate Company Limited

Contractor

Colin Jones (Rock Engineering) Limited

Designer

GWP Consultants

Duration

12 weeks

Key Personnel

General Manager – Richard Wyn Owen

Contracts Manager – Darren Moore

Site Foreman – James Oakes

DESCRIPTION OF PROJECT:

Following design in report, we carried out safeguarding work internally and externally of the cavern, using rope access techniques and the Marini, with netting and bolt installation. Work also included:

  • rock drilling and bolt installation, as well as rock netting
  • Vegetation clearance
  • hand & machine scaling – to remove loose materials
  • spot bolts and/or cable straps to secure potentially unstable blocks with bolts/dowels as appropriate.
  • draped & contoured rockfall netting system, in accordance with design