Home > Projects > Rock face scaling
Rock face scaling
Boston Lodge
Client
OBR Construction Ltd
Contractor
Colin Jones (Rock Engineering) Ltd
Designer
Daear Geo Consulting Ltd
Duration
3 weeks
Key Personnel
General Manager – Richard Wyn Owen
Contracts Manager – Darren Moore
Site Foreman – Jack Jones / Mick Cook
DESCRIPTION OF PROJECT:
Following a rockfall, we were asked to inspect and report with our MEWP and do some scaling work to the area, removing any loose rocks.
We used rock mesh on the upper slope to prevent block failure and rock bolts to work with the new netting. Also, rock anchors were used to mitigiate the risks of further failure or topping.