Rock face scaling


Boston Lodge

Client

OBR Construction Ltd

Contractor

Colin Jones (Rock Engineering) Ltd

Designer

Daear Geo Consulting Ltd

Duration

3 weeks

Key Personnel

General Manager – Richard Wyn Owen

Contracts Manager – Darren Moore

Site Foreman – Jack Jones / Mick Cook

DESCRIPTION OF PROJECT:

Following a rockfall, we were asked to inspect and report with our MEWP and do some scaling work to the area, removing any loose rocks.

We used rock mesh on the upper slope to prevent block failure and rock bolts to work with the new netting. Also, rock anchors were used to mitigiate the risks of further failure or topping.