Rockface work


Devon

Client

Bernie Sweeney

Contractor

Colin Jones (Rock Engineering) Ltd

Duration

4 weeks

Key Personnel

General Manager – Richard Wyn Owen

Contracts Manager – Darren Moore

Site Foreman – Jack Jones / James Oakes

Description of Project

Using our 40:30 Merlo for access, work was carried out to the rockface to stabilise.

Work included:

  • Scaling and removal of the rocks
  • Installing erosion control matting
  • Installing rock fall netting and soil nails / rock anchors
  • Where required, vegetation clearance and removal.

All work was carried out following Covid 19 guidelines on social distancing.