Slope stabilisation
Client
PRIVATE
Contractor
Colin Jones (Rock Engineering) Limited
Designer
Groundsolve Ltd
Duration
8 weeks
Key Personnel
General Manager – Richard Wyn Owen
Contracts Manager – Darren Moore
Site Foreman – James Oakes / Carwyn Ephraim
DESCRIPTION OF PROJECT:
In a SAC and SSSI protected area, stabilising a potentially unstable slope to the rear of a property, using soil nails and netting after de-vegetation.
Accessing area from the farmyard above and behind the property; using rope-access techniques to work on the slope and using a drilling mast to install the anchors.