Stabilisation work
Plas Power
Client
Woodland Trust
Contractor
Colin Jones (Rock Engineering) Ltd
Designer
Daear Geo
Duration
2 months
Key Personnel
General Manager – Richard Wyn Owen
Contracts Manager – Darren Moore
Site Foreman – Carwyn Ephraim
Description of Project
Initially, the work was to construct a gabion wall, but following initial works and site visit we also carried out the following:
- Stabilisation of rockface, with a combination of anchors, dowels and rock mesh
- Constructing suitable protective measures to protect site users (ie. suitable catch fence, walls or interception ditches).
- A non-intrusive solution was required due to the sensitive, environmental setting (SAC and SSSI) and a historical/listed wall being nearby.