Plas Power

Client

Woodland Trust

Contractor

Colin Jones (Rock Engineering) Ltd

Designer

Daear Geo

Duration

2 months

Key Personnel

General Manager – Richard Wyn Owen

Contracts Manager – Darren Moore

Site Foreman – Carwyn Ephraim

Description of Project

Initially, the work was to construct a gabion wall, but following initial works and site visit we also carried out the following:

  • Stabilisation of rockface, with a combination of anchors, dowels and rock mesh
  • Constructing suitable protective measures to protect site users (ie. suitable catch fence, walls or interception ditches).
  • A non-intrusive solution was required due to the sensitive, environmental setting (SAC and SSSI) and a historical/listed wall being nearby.
  • Man drilling the wall
  • Man in a digger digging the ground
  • A collapsed gabion wall