Strengthening retaining wall


A5 trunk road, Llangollen. Phase 2

Client

NMWTRA

Contractor

Jones Bros Ruthin Ltd

Designer

YGC

Duration

7 months

Key Personnel

General Manager – Richard Wyn Owen

Contracts Manager – Darren Moore

Site Foreman – Jack Jones

DESCRIPTION OF PROJECT:

Continuing from previous work and following signs of bulging and movement; we were asked to install a strengthening scheme by:

  • Installing anchors through wall
  • Grouting into the bed rock, tying wall to rock. Also, placing spreader plates under anchor heads to carry loading.

Existing parapet to be taken down and rebuilt higher.